Pemasangan Boks Telepon di Instalasi PLTGU Muara Tawar

Pekerja memasang boks telepon di instalasi tegangan tinggi Pembangkit Listrik Tenaga Gas Uap (PLTGU) Muara Tawar, Bekasi, Jawa barat, Minggu, 25 September 2011. [TEMPO/Arie Basuki; AB2011092502]

Keywords :
PLTG Muara Tawar
Photographer:
Arie Basuki
  • Category :
    Nasional
  • Location :
    Bekasi, Jawa Barat
  • Event Date:
    25-09-2011
  • Uploaded on :
    03-10-2011

Photo | P0310201100058

File Size Pixel Price
320 x 214 Rp. 0
800 x 534 Rp. 150.000
1400 x 935 Rp. 250.000
2108 x 1407 Rp. 500.000