Pemasangan Boks Telepon di Instalasi PLTGU Muara Tawar

Pekerja memasang boks telepon di instalasi tegangan tinggi Pembangkit Listrik Tenaga Gas Uap (PLTGU) Muara Tawar, Bekasi, Jawa barat, Minggu, 25 September 2011. [TEMPO/Arie Basuki; AB2011092505]

Keywords :
PLTG Muara Tawar
Photographer:
Arie Basuki
  • Category :
    Nasional
  • Location :
    Bekasi, Jawa Barat
  • Event Date:
    25-09-2011
  • Uploaded on :
    03-10-2011

Photo | P0310201100060

File Size Pixel Price
320 x 208 Rp. 0
800 x 519 Rp. 150.000
1400 x 908 Rp. 250.000
2193 x 1422 Rp. 500.000