Pemasangan Boks Telepon di Instalasi PLTGU Muara Tawar

Pekerja memasang boks telepon di instalasi tegangan tinggi Pembangkit Listrik Tenaga Gas Uap (PLTGU) Muara Tawar, Bekasi, Jawa barat, Minggu, 25 September 2011. [TEMPO/Arie Basuki; AB2011092506]

Keywords :
PLTG Muara Tawar
Photographer:
Arie Basuki
  • Category :
    Nasional
  • Location :
    Bekasi, Jawa Barat
  • Event Date:
    25-09-2011
  • Uploaded on :
    03-10-2011

Photo | P0310201100061

File Size Pixel Price
320 x 201 Rp. 0
800 x 501 Rp. 150.000
1400 x 876 Rp. 250.000
2259 x 1413 Rp. 500.000